





![]() | Corridor Vc Motorway, Section Mostar South-Počitelj, Motorway Subsection Buna-Počitelj |
![]() | Bosnia and Herzegovina |
![]() | Motorway |
![]() | 2018 – present |
![]() | 7.2 km |
Motorway Subsection Buna-Počitelj is forming part of the project Corridor Vc Motorway project in the Federation of Bosnia and Herzegovina.
With total length of 702km, Corridor Vc Motorway is part of International E-road network, connecting Hungary, Croatia and Bosnia and Herzegovina. The longest part of Corridor Vc goes through Federation of Bosnia and Herzegovina and is a key part in development of the country.
The length of the sub-section Buna – Počitelj is 7.2 kilometers. It starts at about 4 km south of the village of Hodbina. The track does not cross the inhabited area, but passes over the Neretva canyon near several inhabited places and ends just in front of the loop of Počitelj. The route includes two overpasses, one underpass and two crossings for animals, as well as the construction of a two-sided rest area “Rotinski potok”.
BEXEL’S ACTIVITIES
Bexel Consulting is acting as BIM Consultant on this project with some of the major activities including:
- Development of BIM Execution Plan
- Performing BIM Trainings and providing assistance to the stakeholders
- Development and revisions of BIM model of LOD 300 according to the Client’s input
- Creation of BIM Design Review
- Clash Detection analysis
- Model-based Quantity Takeoffs